Monday, April 4, 2011

For Monday, April 4, 2011 - Site Methods

Please download this file for use on your laptops -- it is a survey DWG: http://www.truevis.com/Files/2011-4-4.zip

I hope to cover these subjects:
  • Property Lines and their Tags
  • Property line segment schedule
  • Making a topo surface in Existing Phase
  • Split Surface
  • Discuss Phases for topography
  • Graded Region (makes duplicate topo surface and demolished the existing)
  • Cut and Fill Schedule
  • Split surface
  • Topo materials
  • Site Settings
  • Pads
  • Bring in a survey DWG
  • Set True North from survey DWG
  • Make topo surface from survey DWG's contours
  • Specify coordinates at a point
  • Elevation Base -- Project vs Shared
  • Do Graded Region & Cut and Fill Schedule again
  • Place a Pad
  • Make foundation walls and footings for a garage


No comments:

Post a Comment